Wednesday, September 29, 2010

East Side Glow


With all of the windows in on the East side of the building, the sun reflects off of the wood roof deck creating a great, warm glow.

South End Progress


Entry location change and canopy on the South End now complete.

Concrete Pour



The concrete pour for the west half of the building started today. Roof trim work is nearing completion and all of the windows are in. Building is now DRY!

Friday, September 3, 2010

Roof, Siding, and Windows





The roof work has begun, windows are being installed and siding is nearing completion. The building will be dried in very soon, so that the interior construction can begin. The ceiling is being insulated from above the deck. We are installing ISO board insulation onto the existing deck and then "rebuilding" the new deck on top of the ISO. Once complete, it will be a well insulated, efficient system, while preserving the original wood slat roof structure from the inside. We have had a good stretch of dry weather, hopefully it will continue for about 2 more weeks.

Sandblasting Before and After



All of the wood has been sandblasted, an incredible difference. Here are some good before and after photos.