Friday, November 19, 2010
North Dock and Garage Doors
The wooden dock on the North End of the building is being replaced with a new concrete dock that will be used as a patio. Glass roll-up garage doors are being installed. This will be a great way to let the outside in during the spring and fall.
Friday, November 12, 2010
Interior build-out & Paving
Thursday, November 4, 2010
Walls, Floors and Paint
The interior build-out is moving quickly now. The shell walls are painted, partition walls are going up, and the wood floor is being refinished. The original wood floor that remains is being sanded and sealed while the areas that were repaired are being stained to match the old as closely as possible. Electrical rough-in and HVAC duct work is progressing well. Site work and paving will start this week and should be complete by the end of this month.